Consultancy services for Design and Construction supervision of B1+14 storied DGFI HQ Complex at Dhaka Cantonment, Dhaka
Client/owner: Military Engineering Services (MES) Project description: 15-storied building for DGFI HQ with 400 capacity hall room along with basement and other support facilities. We’re responsible for over all project works that includes details architectural, structural, sanitary design, electrical & fire fighting detailing and also preparation of B.O.Q & cost…
Consultancy services for designs and construction supervision of 8-storied Armed Forces Medical College at Airport Road, Dhaka cantonment, Dhaka
Client/Owner: Military Engineering Services (MES). Scope of Services: An 8-storied institution complex for medical education with all its service requirements and support facilities. We’re responsible for master plan, detailed architectural, structural, sanitary, plumbing and electrical drawing and design works. Landscape design of campus premises was also our duties of work.
Consultancy services for conducting structural design of 1490m RCC Girder Bridge to be constructed on Panchir Bazar- Chilmari Upazila HQ Road over Teesta River in Sundargonj Upazila.
Client/Owner: Local Government Engineering Department (LGED) Project Description: It is a 1490m long prestressed girder bridge, Span Length 48m, Pile Diameter 1200mm and total width of 9.6m over Teesta river. From the starting of design, supervision of construction work we’re core part of this project. Soils and Foundations ltd. was…
Consultancy Services for Design and Supervision of Construction of Flyover at Mirpur-Airport Road and Overpass at Banani Rail Crossing. Services including Sub-soil investigation, Detailed structural design, Bill of Quantities, Cost estimates and Supervision.
Client/owner: Local Government Engineering Department (LGED) Scope of Services: The project includes a total bridge length of 2520m, 4 lane railroad overpasses at Banani rail crossing. From the beginning to end we’re part of this project. Design, supervision of flyover contraction was done by us. In this project we were…