Client/owner: Local Government Engineering Department (LGED)
Scope of Services: The project includes a total bridge length of 2520m, 4 lane railroad overpasses at Banani rail crossing. From the beginning to end we’re part of this project. Design, supervision of flyover contraction was done by us. In this project we were JV with Acumen Consultant House Ltd. superstructure was concrete Box/I girder and RC box girder.